Assemble and start the pool/spa pump, one booster pump, and heater (optional)
Reinstallation on ladders and handrails
Vacuum pool – up to 30 mins Remove, clean, and fold cover
Start-up chemicals
Lower swimming pool water level
Air blow lines and
Install skimmer plugs
Winterize filtration system and pumps
Install winter chemicals
Install owner’s swimming pool cover
The full amount of the package will be billed after the pool opening is complete.